搜索

mbx

/
/
/
The first public announcement of the environmental impact assessment of the laterite nickel mine process development and verification test line of Sichuan Shunying Power Battery Materials Co., Ltd.
Check category

The first public announcement of the environmental impact assessment of the laterite nickel mine process development and verification test line of Sichuan Shunying Power Battery Materials Co., Ltd.

  • Author:
  • Origin:
  • Time of issue:2019-07-30
  • Views:

(Summary description)Sichuan Shunying Power Battery Materials Co., Ltd. entrusted Sichuan Jinmei Environmental Protection Co., Ltd.

The first public announcement of the environmental impact assessment of the laterite nickel mine process development and verification test line of Sichuan Shunying Power Battery Materials Co., Ltd.

Information

Sichuan Shunying Power Battery Materials Co., Ltd. entrusted Sichuan Jinmei Environmental Protection Co., Ltd. to undertake the "technical transformation project of laterite nickel mine process development and verification test line" environmental impact report preparation, according to the "Environmental Impact Assessment Public Participation Measures" (Order No. 4 of the Ministry of Ecology and Environment), the relevant information on the environmental impact assessment of the project is now publicized as follows:

I. Overview of the construction project

1. Project name: Technological transformation project of laterite nickel mine process development and verification test line

2. Construction unit: Sichuan Shunying Power Battery Material Co., Ltd.

3. Nature of construction: technological transformation

4. Construction address: Jinxiang Chemical Industrial Park, Meishan City

5. Project investment: total investment of 11 million yuan

6. Construction content and scale: Upgrading and transforming the laterite nickel mine test line technical transformation project, with a total construction area of ​​1250m2, divided into two sections: wet process zone and nitric acid conversion zone.

 

Second, the name of the construction unit and contact information

Construction unit: Sichuan Shunying Power Battery Material Co., Ltd.

Contact address: Jinxiang Chemical Industrial Park, Meishan City

Contact: Gao Bo                           Tel: 13980377147< /a>

 

3. The name and contact information of the environmental impact assessment agency undertaking the assessment work

Evaluation unit: Sichuan Jinmei Environmental Protection Co., Ltd.

Contact address: No. 166, Jinshi Road, Jinjiang District, Chengdu

Contact: Li Gong                             Tel: 18081190780

 

Four. Network connection of the public comment form

See the attachment for the web link of the public comment form.

 

V. Working procedures and main work content of environmental impact assessment

Environmental impact assessment is a method of analyzing, predicting and evaluating the possible environmental impacts of construction projects, proposing countermeasures and measures to prevent or reducing adverse environmental impacts, and tracking and monitoring methods. Specific working procedures: After receiving the EIA power of attorney, the EIA organization will organize the EIA task force to carry out its work. First enter the site of the proposed project to conduct on-site surveys, and then collect data to determine environmental issues and environmental factors, and clarify environmental protection goals; through engineering analysis and pollution impact analysis, screening of environmental impact factors to determine source strength; through current status survey and monitoring, Carry out the evaluation of the current situation of the ambient air, water environment and acoustic environment, carry out the current situation investigation price of the ecological environment; propose technically feasible and economically reasonable pollution prevention and control countermeasures and measures, and predict and evaluate the scope of the environmental impact of the pollutants discharged after the project is completed And the degree, make a conclusion on whether the project can be accepted by the environment. Finally, the above content is compiled into an environmental impact report and submitted to the environmental protection administrative department for approval.

 

VI. Ways and means for the public to submit public comment forms

The public can feed back the completed public opinion form to the construction unit by letter, fax, e-mail or other methods provided by the construction unit.

Note: During the preparation of the draft of the environmental impact report, the public can submit comments related to the environmental impact assessment to the construction unit.

MORE NEWS

Shunying

Sichuan Shunying Power Battery Material Co., Ltd.

Tel:028-38662031

Add:No. 1, Jinhua Road, Meishan High-tech Industrial Park, Dongpo District, Meishan City, Sichuan Province

© COPYRIGHT 2021 Sichuan Shunying Power Battery Material Co., Ltd.. ALL RIGHTS RESERVED  蜀ICP备2021007096号 Powered by 300.cn